Operations Research
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


OPERATIONS RESEARCH
Vol. 56, No. 3, May-June 2008, pp. 665-680
DOI: 10.1287/opre.1080.0543
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Angelus, A.
Right arrow Articles by Porteus, E. L.
Right arrow Search for Related Content

An Asset Assembly Problem

Alexandar Angelus, Evan L. Porteus

Lee Kong Chian School of Business, Singapore Management University, Singapore 178899
Stanford Graduate School of Business, Stanford, California 94305

angelus{at}smu.edu.sg
eporteus{at}stanford.edu

We formulate a finite-horizon nonstationary dynamic single-asset assembly problem, which covers both a liquid-asset assembly problem, based on the work of Rosling published in 1989, where the single asset is the single product being assembled, and a fixed-asset assembly problem, in which the single asset is production capacity. In the latter case, capacity is assembled over time from components and may be used to manufacture many products. In the spirit of Rosling, we provide conditions under which it can be solved by an equivalent analogous serial model in the form developed by Clark and Scarf in 1960, with a separate state variable for the level of assets in each stage of completion, dramatically simplifying the problem and its solution. In the liquid-asset case, we extend Rosling's 1989 work by including nonstationary demands, costs, and revenues in a finite-horizon setting. In the fixed-asset (capacity) expansion case, we show that capacity should be assembled in a balanced way and derive the optimal timing and extent of delays (in previously initiated capacity expansions). Our basic capacity expansion model is deterministic, so under our conditions, it is optimal never to delay a schedule and the state space reduces to a single dimension. However, in the Markov-modulated case, in which cost parameters and customer demand distributions can be influenced by a randomly and exogenously evolving state (of the economy), we illustrate that delays can be optimal.

Subject classifications: dynamic programming; state space reduction; facilities/equipment planning; dynamic assembly; inventory/production; multiechelon nonstationary assembly.
History: Received June 2005; revision received July 2006; accepted December 2006.







HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2008 by INFORMS.