Operations Research
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


OPERATIONS RESEARCH
Vol. 54, No. 2, March-April 2006, pp. 311-323
DOI: 10.1287/opre.1050.0258
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Anily, S.
Right arrow Articles by Grosfeld-Nir, A.
Right arrow Search for Related Content

An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand

Shoshana Anily, Abraham Grosfeld-Nir

Faculty of Management, Tel Aviv University, Tel Aviv 69978, Israel
Academic College of Tel-Aviv-Yaffo, Tel Aviv, Israel

anily{at}post.tau.ac.il
agn{at}mta.ac.il

A batch production process that is initially in the in-control state can fail with constant failure rate to the out-of-control state. The probability that a unit is conforming if produced while the process is in control is constant and higher than the respective constant conformance probability while the process is out of control. When production ends, the units are inspected in the order they have been produced. The objective is to design a production and inspection policy that guarantees a zero defective delivery in minimum expected total cost.

The inspection problem is formulated as a partially observable Markov decision process (POMDP): Given the observations about the quality of the items that have already been inspected, the inspector should determine whether to inspect the next unit or stop inspection and possibly pay shortage costs. We show that the optimal policy is of the control limit threshold (CLT) type: The observations are used to update the probability that the production process was still in control while producing the candidate unit for inspection. The optimal policy is to continue inspection if and only if this probability exceeds a CLT value that may depend on the outstanding demand and the number of uninspected items. Structural properties satisfied by the various CLT values are presented.

Subject classifications: dynamic programming; optimal control; Markov; applications; probability; stochastic model application.
History: Received June 2002; revision received January 2005; accepted January 2005.







HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2006 by INFORMS.