Operations Research
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


OPERATIONS RESEARCH
Vol. 53, No. 2, March-April 2005, pp. 313-327
DOI: 10.1287/opre.1040.0167
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Liu, J.
Right arrow Articles by Jiang, Y.
Right arrow Search for Related Content

An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem

Jiyin Liu, Yun Jiang

Business School, Loughborough University, Loughborough, Leicestershire LE11 3TU, United Kingdom
Department of Industrial Engineering, Bilkent University, 06800 Bilkent, Ankara, Turkey

j.y.liu{at}lboro.ac.uk
jiangyun{at}bilkent.edu.tr

Hoist scheduling is a typical problem in the operation of electroplating systems. The cyclic scheduling policy is widely used in these systems in industry. Research on hoist scheduling has focused on the cyclic problem to minimize the cycle length. Most previous studies consider the single-hoist case. In practice, however, more than one hoist is often used in an electroplating line. This paper addresses the two-hoist, no-wait cyclic scheduling problem, in which the tank-processing times are constants and, upon completion of processing in a tank, the parts have to be moved to the next tank immediately. Based on the analysis of the problem properties, a polynomial algorithm is developed to obtain an optimal schedule. This algorithm first identifies a set of thresholds, which are special values of the cycle length, so that the feasibility property may change only at these thresholds. Feasibility checking is then carried out on each individual threshold in ascending order. The first feasible threshold found will be the optimal cycle length, and the corresponding feasible schedule is an optimal hoist schedule.

Subject classifications: production/scheduling: cyclic; two hoists; no-wait; noncrossing; manufacturing: automated electroplating systems; robotic cells.
History: Received February 2002; revision received November 2003; accepted December 2003.







HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2005 by INFORMS.